Broadway South Dance

Home | About
Michelle
| Our
Studio
| Faculty | Photo
Gallery
| Classes | Press
News
| Company | Request
Info
| Reviews
Are In!
 

Construction Gallery

Construction is done!!!  This is a scrapbook of our process from the beginning.






June 2005 - What a perfect location!


July 2005 - We have a sign now






Plans are underway for our studio.  We have our layout staked out.  Construction will start soon.

 


Come by and see our new sign on Schillinger Road.

 


Owners Michelle and Warren Meeker


 






May 2006 Breaking Ground










First day of construction June 13,2006







Morgan checking things out at the end of week 1 of construction



6,000 sf. for dancin' feet!


Morgan and Ryan


Michelle admiring the space


Warren and Ryan check out construction equipment


 


The plumbing is in.



The foundation is poured.

 


Here is our building!

The Building is going up!!!!


















Our building takes shape.


The sides are going on


The frame is done.  The sides and roof are on. Most of the work is going on inside!  (Aug 23 2006)


The sides and roof are on - The drop-off overhang is being added.  Won't it be great to drop off the kids without them getting wet!  (Aug 28 2006)



Studio 1 takes shape  (Aug 28 2006)


Studio 2 - Sheetrock is going in. (Sept 5, 2006)


Morgan in Studio 1 (Aug 30, 2006)

 


Front Entrance (Aug 30 2006)


Lobby Area (Aug 30 2006)


Lobby (September 13, 2006)

 


 Hall leading to our 2 dressing rooms (Sept. 14, 2006)



One of our 2 dressing rooms (Sept. 14, 2006)


 Front of our building being prepped for asphalt.  Our canopy for rainy days is now completed. (Sept. 14, 2006)


Studio 1 (Our big studio at 1350 sf) being primed for paint. Ceiling work and air duct work being prepped. Sprung floors coming next. (Sept 16, 2006)


Studio 2 (our smaller studio at 784 sf) getting its first coat of color.  Next step is laying our sprung flooring system (Sept 16, 2006)


Lobby gets painted (Sept 17, 2006)



Studio 1 at 60% completion on the sprung floor system (September 25, 2006)


Michelle prepping our sprung floor system (September 25, 2006)

 
     
     
Copyright © 2008, 2007, 2006, 2005 Broadway South Dance. All Rights Reserved.
Reproduction in whole or in part in any form or medium with out expressed written permission of Broadway South Dance Studio is prohibited.